NEW
 
108TH ST W ROAD CLOSED FROM BRYANS AVE TO CIRCLE DR E
(resurfacing)
Start: September 21, 7:00 a.m. End: September 22, 6:00 p.m.
 
11TH ST W WB CURB LANE CLOSURE AT DUNDONALD AVE
(Test station repair)
Start: September 21, 8:00 a.m. End: September 21, 5:00 p.m.
 
22ND ST W EB & WB MEDIAN LANES CLOSED FROM AVE B N TO AVE C S
(median repairs)
Start: September 22, 7:00 a.m. End: September 23, 5:00 p.m.
 
25TH ST E WB CURB LANE CLOSED FROM 6TH AVE N TO 5TH AVE N
(sidewalk repairs)
Start: September 22, 7:30 a.m. End: September 22, 10:00 a.m.
 

ONGOING
 
LORNE AVE INTERSECTION CLOSED AT 2ND ST W
(Water main replacement)
Start: September 16, 7:00 a.m. End: September 21, 5:00 p.m.
 
HIGHWAY 5 WB ROAD CLOSED FROM RANGE ROAD 3043 TO HIGHWAY 41
(resurfacing)
Two-way traffic will be maintained in the WB lanes. Temp Traffic lights will be used where there is no room for 2-way traffic.
Start: September 16, 7:00 a.m. End: September 24, 7:00 a.m.
 
IDYLWYLD DR N NB CURB LANE CLOSED FROM 25TH ST E TO 31ST ST E
(concrete replacement)
Start: September 16, 9:00 a.m. End: September 25, 5:00 p.m.

CLARENCE AVE S SB LEFT TURN LANE CLOSED AT BRAND RD
(roadway construction)
Start: August 26, 7:00 a.m. End: September 26, 4:00 p.m.
 
CONFEDERATION DR SB PARKING LANE CLOSED FROM CONFEDERATION PL TO BORDEN PL
(Sidewalk replacement)
Start: September 19, 7:00 a.m. End: September 26, 5:00 p.m.
 
3RD AVE S SB ROAD CLOSED FROM 19TH ST E TO SPADINA CRES E
(material craning)
Start: September 2, 6:00 a.m. End: September 27, 5:00 p.m.
 
8TH ST E WB PARKING CLOSED FROM LANSDOWNE AVE TO DUFFERIN AVE
(concrete work)
Start: September 20, 9:00 a.m. End: September 27, 9:00 p.m.

7TH AVE N ROAD CLOSED FROM PRINCESS ST TO QUEEN ST
(Water main replacement)
Start: September 6, 7:00 a.m. End: September 30, 5:00 p.m
 
WANUSKEWIN RD NB LANES CLOSED AT 71ST ST E; TWO WAY TRAFFIC SET IN SB LANES
(road construction)
Start: August 6, 9:00 a.m. End: October 6, 4:00 p.m.
 
SID BUCKWOLD BRIDGE NB & SB LANES RESTRICTED
(Bridge upgrades)
Lanes restricted in both directions; NB lanes zipper merge near 8th St. SB single lane starting at 20th St.
Start: April 14, 8:30 a.m. End: October 31, 5:00 p.m.

MCORMOND DR INTERSECTION CLOSED AT BRIGHTON CMN
(construction)
 Start: July 25, 7:00 a.m. End: October 31, 5:00 p.m.
 
COLLEGE DR WB SPEED REDUCTION FROM MCORMOND DR TO MCKERCHER DR
 (construction)
 Start: July 5, 9:00 a.m. End: November 30, 5:00 p.m.

All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.

Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.